Bridge Z
Client: ThyssenKrupp Steel AG
Address: Hoffsche Strasse, 47139 Duisburg
Project management TVF:
Region West, Oberhausen
Timeframe:
Begin: 26/04/2004 End: 20/08/2004
Job description:
Lightening of the bridge through the removal of the track cover, supporting of the bridge with hydraulic chassis, lifting and swinging of the bridge with a 1,000-ton girdermast caterpillar crane
Scrapping of the bridge, including reducing the elements to a manageable size and their subsequent delivery to Oxigenstahlwerk in Duisburg
Quantity details:
- 250 cubic metres of road surface with under construction
- 1,200 tons of scrap steel






