Decommissioning of the power plant boiler house in Lippendorf

Client:

Biq GmbH

Lippendorf/ Picture 1

Lippendorf/ Picture 1

Address: Sigmund-Bergmann-Strasse 1, 03222 Luebbenau

Project management TVF:

Region South East, Luebbenau

Time frame:

Begin: February 2005; End: June 2006

Job description:

  • Complete sanitation of pollutants in only 14 weeks with approx 95 workers

    Lippendorf/ Picture 2

    Lippendorf/ Picture 2

  • Preparation of a controlled explosion including static safety measures
  • Partial deconstruction (circa 2,000 tons) of boiler house number 1, due to its proximity to the coal-feed of the new power station
  • Controlled explosion of the 7 boilers and subsequent sorting of the scrap steel into containers
  • Complete removal of underground rubble with subsequent preparation, recycling and refilling of the site

Quantity details:

  • diverse leak proofing materials on portholes and flanges etc.

    Lippendorf/ Picture 3

    Lippendorf/ Picture 3

  • Mineral wool insulation on the boiler walls 38,000 square metres
  • Asbestos façade 7,400 square metres
  • Redeveloped area circa 400,000 cubic metres
  • Scrap steel circa 24,000 tons
  • Concrete rubble circa 19,000 cubic metres
  • Excavation volume with refilling 25,000 cubic metres

Controlled explosion details:

  • Hollow space explosion of the water-filled supports
  • Detonator cable Dynacord 1,200 metres
  • Explosive Eurodyn 2000 120 kilograms
  • 60 fuses