Fire damage clearance in Quartz Works Hohenbocka
Client:
Quarzwerke GmbH
Project management TVF:
Region South/East
Time frame:
Begin: 01 March 2007; End: 24 April 2007
Job description:
The processing facilities in Quartz Works Hohenbocka were destroyed in a large fire.
Special factors:
The intense heat caused serious deformation of the buildings leaving them under tension, in some cases load-bearing girders were torn from their mountings.
The deconstruction was completed on the basis of a special working plan in conformance with mining laws, some sections requiring appropriate statically calculated technology. All operations were completed from the safety cage from top to bottom.
Quantity details:
Building length circa 60 metres, width circa 25 metres, height circa 30 metres
Steel construction circa 2,000 tons
Machinery used:
- Two 100 ton cranes
- Hitachi KH 125 cable excavator with 35 metres operational range
- Various smaller cranes
- Hydraulic excavator LH 932 with a scrap shear for the preparation and loading of the scrap