Weser Stadium Bremen, dismantling of the roof construction of the north and south stands
Cient:
Bremer Weser Stadion GmbH
Franz-Böhmert-Straße 7
28205 Bremen
Project management TVF:
Region East, Rostock office
Timeframe:
Begin: 01 September 2008
End: February 2009
Project description:
- dismantling of the roof construction (Roofing felt, plywood panels, profiled sheeting) approx. 6.000 square metres, using hydraulic platforms and telescopic cranes
- installation of purpose-built working platforms on the pre-stressed support, also to be removed
- creating of openings for the removal of material
- removal of the pre-stressed concrete connectors using concrete sawing techniques
- sealing of the cuts
- dismantling of the purpose-built staging
Technical details:
- 2 telescopic cranes, 2-3 four-wheel drive hydraulic platforms, 1 hydraulic platform lorry, 1 wheel loader, 1 articulated lorry
- Concrete rubble: approx. 180 tons
- Scrap steel: approx. 700 tons