Weser Stadium Bremen, dismantling of the roof construction of the north and south stands

Cient:

Bremer Weser Stadion GmbH
Franz-Böhmert-Straße 7
28205 Bremen

Project management TVF:

Region East, Rostock office

Timeframe:

Begin: 01 September 2008
End: February 2009

Project description:

  • dismantling of the roof construction (Roofing felt, plywood panels, profiled sheeting) approx. 6.000 square metres, using hydraulic platforms and telescopic cranes
  • installation of purpose-built working platforms on the pre-stressed support, also to be removed
  • creating of openings for the removal of material
  • removal of the pre-stressed concrete connectors using concrete sawing techniques
  • sealing of the cuts
  • dismantling of the purpose-built staging

Technical details:

  • 2 telescopic cranes, 2-3 four-wheel drive hydraulic platforms, 1 hydraulic platform lorry, 1 wheel loader, 1 articulated lorry
  • Concrete rubble: approx. 180 tons
  • Scrap steel: approx. 700 tons